Green Tractor Scheme New Phase: Latest Registration, Subsidy and Eligibility

0
Green Tractor Scheme New Phase: Latest Registration, Subsidy and Eligibility

⚠️ Update — 11 October 2026: Applications for the Rs 1 million subsidy phase (Phase V: 9,500 high-power tractors, 75–125 HP) closed on 5 October 2026, and no new phase has been announced since. The details below are kept for reference — check gts.punjab.gov.pk for any fresh announcement.

⚠️ Deadline Update (12 Oct 2026): The application deadlines for the Green Tractor Scheme phases have passed (Phase IV: 5 Sept 2026; High-Power Programme: 5 Oct 2026). New applications are no longer being accepted. If you applied, check your ballot status on the official portal (gts.punjab.gov.pk). We will update this page when a new phase is announced.

Green Tractor Scheme New Phase

The Green Tractor Scheme 2026 is being implemented by the Punjab government through two new phases for the 2026–27 financial year. The Punjab Agriculture Department has listed Phase IV as the Low Power Green Tractor Program and Phase V as the Hi Power Green Tractor Program.

Together, the two phases target 19,500 subsidized tractors. Phase IV covers 10,000 tractors in the 50 to 65 horsepower range with a subsidy of Rs. 750,000 per tractor, while Phase V covers 9,500 tractors from 75 to 125 horsepower with a subsidy of Rs. 1 million per tractor.

Green Tractor Scheme 2026 Latest Update

The latest major development came on September 23, 2026, when the Punjab government conducted digital balloting for Phase IV and opened the application portal for Phase V. This means farmers should not treat Phase IV as a new registration opportunity because its current round has already moved to the balloting stage.

The first successful applicant announced during the Phase IV balloting was Masood Khan, son of Lal Khan, from Attock. The government also reported that more than 213,637 farmers had applied for the programme, while 128,757 were declared eligible for balloting after verification through the Punjab Land Records Authority and NADRA.

Punjab Green Tractor Scheme 2026: Rs. 750,000 Subsidy, Eligibility & Appl

Green Tractor Scheme 2026 Phase IV

Phase IV is officially listed by the Punjab Agriculture Department as the Chief Minister’s Punjab Green Tractor Program (Low Power). The programme targets 10,000 subsidized tractors in the 50 to 65 HP category for farmers with land holdings of 5 acres or above.

The subsidy is Rs. 750,000 for each tractor. According to the official 2026–27 development record, Phase IV has an estimated cost of Rs. 7.6482 billion, with Rs. 6.261 billion allocated for 2026–27.

The Phase IV application process has already passed the registration stage. The government conducted digital balloting on September 23, 2026, after checking applicant eligibility. Therefore, farmers looking for a fresh Phase IV application should wait for any official announcement about a future round instead of relying on websites claiming that the old registration is still open.

Green Tractor Scheme New Phase: Latest Registration, Subsidy and Eligibility

Green Tractor Scheme 2026 Phase V

Phase V is officially called the Chief Minister’s Punjab Green Tractor Program (Hi Power). It has a target of 9,500 tractors in the 75 to 125 HP category and provides a subsidy of Rs. 1 million per tractor.

The official Agriculture Department record specifies a minimum land holding of 7 acres or above for this phase. The department lists the estimated cost of Phase V at Rs. 9.59655 billion, with an allocation of Rs. 9.9 billion for 2026–27.

The Phase V application portal was opened on September 23, 2026, alongside the Phase IV balloting. The official Agriculture Department’s Green Tractor Program page currently shows an option to apply for the Hi-Power Green Tractor, so farmers interested in Phase V should use the government system rather than third-party registration websites.

Green Tractor Scheme 2026 Subsidy and Eligibility

The subsidy and land requirement depend on the phase. This is important because information from Phase IV should not automatically be applied to Phase V.

Phase Tractors HP Range Subsidy Minimum Land
Phase IV 10,000 50–65 HP Rs. 750,000 5 acres
Phase V 9,500 75–125 HP Rs. 1,000,000 7 acres

The official Punjab Agriculture Department confirms these targets, horsepower categories, subsidy amounts and minimum land holdings in its 2026–27 Chief Minister’s Initiatives record.

Meeting the minimum land requirement does not by itself guarantee a tractor. Phase IV had significantly more eligible applicants than the available tractor quota, which is why the government used digital balloting after verification. The same selection method and conditions should not be assumed for Phase V until the official application instructions for that phase are followed.

Who Can Apply for Green Tractor Scheme 2026?

For Phase IV, the official 2026–27 record states that farmers with land holdings of 5 acres and above are eligible for the Low Power Green Tractor Program. For Phase V, the official record gives a minimum land holding of 7 acres and above.

Applicant information is also subject to government verification. During the Phase IV process, the authorities reported using Punjab Land Records Authority and NADRA verification before finalizing the eligible applicants for balloting.

Farmers should therefore make sure that their personal information and land record details are accurate before applying. An application should not be treated as confirmed until it has passed the relevant government verification process.

Important Eligibility Points

  • Phase IV requires a minimum land holding of 5 acres and covers 50–65 HP tractors.
  • Phase V requires a minimum land holding of 7 acres and covers 75–125 HP tractors.
  • Applicant information is subject to government verification.
  • Selection is not guaranteed simply because an applicant meets the basic land requirement.
  • Farmers should follow the eligibility conditions shown for the specific phase they are applying for.
  • Phase IV has already gone through digital balloting, while Phase V applications have been opened.

The district-wise quota can also affect the distribution of tractors. The government said quotas for Phase IV were fixed according to the proportion of cultivated land in each district.

Green Tractor Scheme 2026 Registration and Apply Online

The Green Tractor Scheme registration process is being handled through the Punjab Agriculture Department’s official system. The department has a dedicated Green Tractor Program page that provides application options and scheme information.

At the time of this update, the important distinction is between the two phases. Phase IV registration has already ended with the digital balloting held on September 23, while the official department page currently provides an application option for the Hi-Power Green Tractor under Phase V.

Hunarmand Punjab Program for Sindh Students 2026 Eligibility, Benefits & Apply Online

How to Apply for Green Tractor Scheme 2026

Farmers interested in Phase V should first open the official Punjab Agriculture Department Green Tractor Program page and use the active Hi-Power Green Tractor application option.

The application should be completed using the information requested by the official portal. Farmers should carefully review their details before submitting the form because incorrect personal or land information can create problems during verification.

  1. Open the official Punjab Agriculture Department Green Tractor Program page.
  2. Select the active application option for the relevant phase.
  3. Enter the required personal and land information.
  4. Provide the CNIC and other details requested by the official system.
  5. Review the information carefully before submitting the application.
  6. Save any application or reference information provided after submission.
  7. Follow the official instructions for verification and selection.
  8. Do not rely on an unofficial website claiming to guarantee selection.

The Agriculture Department’s official page is the main source farmers should use for the current application link and any changes to the procedure.

Documents Required for Green Tractor Scheme 2026

The exact documents and information required can depend on the phase and the active application form. Farmers should therefore avoid copying document lists from old Green Tractor Scheme articles because previous phases may have used different application requirements.

A farmer should have valid CNIC information and accurate land ownership or land record details available before starting the application. This is particularly important because the government has used official records for applicant verification in the programme.

If the current Phase V portal asks for additional information or documents, applicants should follow the fields and instructions displayed there. The official government application requirements should take priority over lists published by third-party websites.

Green Tractor Scheme 2026 Balloting Process

The Phase IV balloting was conducted digitally on September 23, 2026. The process followed verification of applicants, with 128,757 farmers declared eligible for balloting out of more than 213,637 applications.

This difference between total applications and eligible applicants is important. It shows that submitting an application does not automatically place every applicant into the final draw. Government verification was carried out before the eligible list was finalized.

The government also stated that district-wise tractor quotas were fixed according to the proportion of cultivated land. Bhakkar, Jhang, Lodhran and Vehari were among the districts mentioned as having relatively higher shares.

Green Tractor Scheme 2026 Tractor Models

The government has not published a complete model-by-model consumer list on the main Agriculture Department page in the information currently available. Farmers should therefore avoid relying on unofficial articles that present a long list of tractor models as confirmed for every phase.

During the September 23 briefing, officials highlighted locally manufactured 90 HP tractors and locally assembled 100 HP tractors. The Agriculture Minister also stated that five locally manufactured tractor models had been included in the programme.

The actual tractor choice available to an applicant can depend on the approved manufacturers, models and conditions of the relevant phase. Farmers should check the official application system and government instructions before treating a particular model as confirmed.

Green Tractor Scheme 2026 Government Budget

The Punjab Agriculture Department has listed separate financial figures for the two 2026–27 Green Tractor phases.

Phase Official Estimated Cost 2026–27 Allocation Target
Phase IV – Low Power Rs. 7.6482 billion Rs. 6.261 billion 10,000 tractors
Phase V – Hi Power Rs. 9.59655 billion Rs. 9.9 billion 9,500 tractors

The official figures come from the Punjab Agriculture Department’s 2026–27 Chief Minister’s Initiatives record. The figures should be read as separate phase-level development costs and allocations rather than simply treating every listed amount as a direct subsidy pool.

The government has also announced a total allocation of Rs. 17.6 billion for the Green Tractor Scheme in the current fiscal year in its September 23 briefing.

Is Green Tractor Scheme Registration Free?

There is no application fee for the Punjab Chief Minister’s Green Tractor Program based on the government’s previously confirmed position. A Geo Fact Check investigation found claims about a mandatory Rs. 5,000 application fee to be false and quoted Punjab Agriculture Department officials confirming that farmers were not charged to apply.

Farmers should still distinguish between an application fee and the farmer’s own financial contribution toward a subsidized tractor after selection. The subsidy reduces the price by the announced amount, but it does not mean the government pays the full tractor price.

Green Tractor Scheme 2026 Previous Distribution

The Punjab government said during the September 23 briefing that 24,000 tractors had already been provided to farmers under the programme, with a subsidy of Rs. 1 million per tractor.

The same briefing gave broader figures for agricultural mechanisation during the current administration. These figures cover different periods and categories, so they should not be combined with the 2026–27 Phase IV and Phase V targets as though they represent one single distribution round.

Apna Khet Apna Rozgar Scheme 2026: Punjab Begins 5-Acre Land Allotment

Important Things Farmers Should Know

The Green Tractor Scheme 2026 now has two different phases with different land requirements, tractor categories and subsidy amounts. Farmers should identify their relevant phase before checking eligibility or applying.

  • Phase IV: 10,000 tractors, 50–65 HP and Rs. 750,000 subsidy.
  • Phase V: 9,500 tractors, 75–125 HP and Rs. 1 million subsidy.
  • Minimum land requirement: 5 acres for Phase IV and 7 acres for Phase V.
  • Phase IV digital balloting was conducted on September 23, 2026.
  • Phase V applications were opened on September 23, 2026.
  • Applicant information can be checked against government records.
  • Use the official Punjab Agriculture Department system for registration.
  • Do not pay an unofficial agent or website claiming to guarantee selection.

Farmers should also be careful with old articles showing previous registration dates, different subsidies or different eligibility requirements. The current 2026–27 Agriculture Department record should be used when information conflicts with older scheme details.

Green Tractor Scheme 2026 Official Website

The Punjab Agriculture Department maintains the official Green Tractor Program page where farmers can find the current application options and programme information.

The department’s current page shows the Hi-Power Green Tractor application option for Phase V, while its official 2026–27 development record confirms the targets, horsepower categories, subsidies and land requirements for both phases.

Farmers should check the official page before submitting an application because government portals, application instructions and deadlines can change.

Green Tractor Scheme 2026 FAQs

What is the Green Tractor Scheme 2026?
It is Punjab’s subsidized tractor programme with 19,500 tractors planned under Phase IV and Phase V.

How many tractors are offered in Phase IV?
Phase IV covers 10,000 tractors in the 50–65 HP category with a Rs. 750,000 subsidy per tractor.

How many tractors are offered in Phase V?
Phase V covers 9,500 tractors in the 75–125 HP category with a Rs. 1 million subsidy per tractor.

What is the minimum land for Phase IV?
The official 2026–27 record specifies 5 acres or above for Phase IV.

What is the minimum land for Phase V?
The official Agriculture Department record specifies 7 acres or above for Phase V.

Is Green Tractor Scheme Phase IV registration still open?
No. Phase IV moved to digital balloting on September 23, 2026, so its current application round has already passed the registration stage.

Is Green Tractor Scheme Phase V registration open?
The Punjab Agriculture Department currently shows an application option for the Hi-Power Green Tractor, Phase V.

How are Green Tractor Scheme applicants selected?
For Phase IV, eligible applicants were selected through digital balloting after government verification.

Is Green Tractor Scheme registration free?
Yes. The programme has previously been confirmed as having no application fee.

Where should farmers apply for the Green Tractor Scheme?
Farmers should use the official Punjab Agriculture Department Green Tractor Program page and follow the active application instructions.

Conclusion

The Green Tractor Scheme 2026 is currently moving through two separate programmes in Punjab. Phase IV covers 10,000 low-power tractors and has already reached the digital balloting stage, while Phase V covers 9,500 high-power tractors and its application portal has been opened.

The official Agriculture Department record gives 5 acres as the minimum land holding for Phase IV and 7 acres for Phase V. Farmers should therefore check the requirements for their specific phase and use the official government application system rather than relying on outdated registration dates, unofficial websites or agents.

Punjab Livestock Card 2026 Eligibility, Online Registration & Rs 540,000 Loan Details

Leave a Reply

Your email address will not be published. Required fields are marked *